HO11 architects: exceptional residential properties
Exceptional residential properties, designed to HO11’s truly outstanding standard and taken through planning.
We design new homes for open countryside under HO11 of the NPPF, the policy previously known as Paragraph 84. This is one of the hardest residential planning permissions to win, influenced by the quality of the design in reaching the required “exceptional” standard. We are ARB registered and RIBA chartered, with more than 20+ years of architectural practice experience in complex countryside planning across Shropshire, Cheshire and North Wales and across the UK.

What is HO11?
HO11 of the National Planning Policy Framework (NPPF) sets out the limited circumstances in which a new isolated home can be built in the countryside, where planning would normally be refused. The most relevant aspect of these projects relates to design, because a home of exceptional quality can be permitted where an ordinary one would not. It is the recognised route to a genuine one-off house in the open countryside and on rural land.
The policy was previously named Paragraph 84 – Paragraph 80 and Paragraph 79 before that – so older guides and case references to a “Paragraph 80 house” or a “Paragraph 79 house” are describing the same test under its earlier references.
Our paired guide, HO11 explained, goes deeper into the policy and the criteria. For planning applications, appeals and other planning permission work, see our planning service page.

The “truly outstanding” design test
To succeed under HO11, the design has to be truly outstanding. The NPPF wording asks for a home that reflects the highest standards in architecture and would help to raise design standards in rural areas more generally. It must also be sensitive to the defining characteristics of the local area, while significantly enhancing its immediate setting.
In practice that means a scheme judged against a set of demands:
See our architectural design service for how that work is done, and our guide to sustainable and low-carbon design for the environmental side of the case.
Exceptional architecture
A design of genuine architectural distinction, not simply a large house.
Sensitivity to landscape and setting
A home that fits into its environment and improves its surroundings.
Sustainability
A low-energy, well-considered building for the long term.
Local distinctiveness
A response to the locale, its materials and its character.
Is there any certainty of getting planning permission?
There is no guarantee of planning permission under HO11. It is a demanding test, often decided by the planning committee, and it involves a degree of subjective judgement about design quality. The policy is meant to permit only the most exceptional designs.
Three things make the difference: a site that has been thoroughly assessed in terms of its classification as being isolated, a design of genuine quality, and early engagement with both the Local Authority and a specialist independent design review panel.We assess the site you have and the strength of the case that can be built on it. If we do not think it will succeed, we will tell you before you invest on an application. Start with our pre-application advice, or read more about the practice.

How long does an HO11 project take, and what does it cost?
An HO11 project usually runs longer than a normal design development process due to the heavy focus on a property that meets the required quality of being independently deemed as being ‘truly outstanding architecture’. Most of the timeline is the design development, pre-application engagement and creation of supporting evidence needed before submission. The government still sets a statutory period of eight weeks for the planning determination itself, once an application is validated.
We review the opportunity against your specific site and brief and then agree a fixed fee with you in writing, rather than quoting a headline figure.

Our process, from land to planning permission to completion
An HO11 project runs over a longer programme than a standard home, and the planning stage in particular takes longer. The same team is on the project from the first site visit through to a finished building.
See our pre-application advice, planning applications, architectural design and building regulations services for the stages in detail.
Site appraisal and feasibility
We review the opportunity in terms of planning policy and existing site constraints, producing a site appraisal and feasibility study, and give you an honest view before you further commit.
Concept design and initial design options
We develop initial design options aimed squarely at the truly outstanding test.
Pre-application and design review
We engage with the authority and an external design review panel early, where their view shapes the scheme.
Landscape, heritage and sustainability evidence
We assemble the supporting case the policy demands.
Submission and determination
We submit and manage the application through to a decision.
Detailed design, building regulations, tender and on site
We take the consented design through technical design and building regulations, tender the works to appoint a contractor, and administer the building contract through construction.
Why choose Base Architects for your HO11 home
HO11 rewards design quality. We are an award-winning Practice with a strong track record on securing complex countryside and HO11 approvals that have turned some of the hardest sites in the region into exceptional homes. We know how local planning authorities across the UK approach HO11 applications.
We call it honest architecture. That means an early, honest review of your planning opportunity and a design built to meet the test. See our projects, read more about the practice, or explore our wider residential work.

Start your HO11 project
If you own, or are considering, a countryside site, the sensible first step is a feasibility view. We will tell you honestly where you stand. You can also read HO11 explained, see our planning service, or browse our projects.

Frequently asked questions
An HO11 house is a new home built in isolated open countryside under HO11 of the NPPF, permitted on the strength of exceptional design where planning would normally be refused. It is the recognised route to a one-off rural home, and the design must meet the policy’s truly outstanding test.
Yes, HO11 is the current reference for the policy that was Paragraph 84 until the revised NPPF published on 17 August 2026, and Paragraph 80 and Paragraph 79 before that (and Paragraph 55 earlier still). The exceptional-design route is the same, though its wording has been tightened as the NPPF has been revised.
There is no guarantee. HO11 is a demanding, partly subjective test decided by the planning committee, and many applications across the UK are refused. The right site, a genuinely outstanding design and early engagement with the authority significantly improve the odds, so a feasibility view is essential early on in a project’s development.
It is possible but harder. In a National Landscape (formerly an Area of Outstanding Natural Beauty), landscape and setting carry even more weight, so the design and the supporting evidence must be stronger still. Early advice on whether a specific site is realistic matters most here.
Longer than a standard home. The design, pre-application engagement and evidence needed before submission take the most time; the government sets a statutory period of eight weeks for the planning determination itself, once validated. We give you a realistic timeline at feasibility.