Building regulations explained

21/06/2026

Uncategorized

Building regulations explained

Building regulations are the minimum legal standards for the design and construction of buildings in England and Wales, covering structure, fire safety, energy, ventilation, drainage and accessibility.

Most building work needs building control approval before and during the work, through either a Full Plans application or a Building Notice. This is separate from planning permission, and you often need both.

What are building regulations?

Building regulations are the minimum legal standards a building must meet in England and Wales. They set the technical requirements for how a building is designed and built so it is safe, healthy, energy-efficient and accessible. They apply to most new buildings and to a lot of work on existing ones.

The detailed guidance sits in the Approved Documents, published by the government, each covering a different area. The main ones are:

There are more, running from Part A to Part R, covering drainage, sound, glazing and other areas. Wales has its own set of Approved Documents, which have moved apart from England’s in places, so the standards differ across the border.

Building regulations are enforced by building control, and meeting them is a legal duty.

  • Part A – structure.
  • Part B – fire safety.
  • Part C – site preparation and resistance to moisture.
  • Part F – ventilation.
  • Part L – conservation of fuel and power (energy).
  • Part M – access to and use of buildings.
  • Part P – electrical safety.

When do you need building regulations approval?

Most new building work, structural changes and changes of use need building control approval. A small number of minor works are exempt. Building regulations apply separately from planning permission, so a project can need approval even when it does not need planning permission.

Work that usually needs approval:

Work that is often exempt:

Exemptions have conditions, and getting one wrong is a common and expensive mistake, so check before you start if you are extending or converting. Our guides to extensions, new build and self-build and Class Q change of use cover the routes where approval usually applies.

  • New buildings and most extensions.
  • Garage and cellar conversions.
  • Structural alterations, such as removing a load-bearing wall or forming an opening.
  • Change of use, for example converting a barn to a home.
  • New or altered drainage, and many replacement windows, boilers and electrical installations.
  • Often exempt: some porches and conservatories below a certain size, at ground level and separated from the house.
  • Often exempt: small detached outbuildings within limits, with no sleeping accommodation.
  • Often exempt: certain repairs on a like-for-like basis.

How to get building regulations approval

You get building regulations approval through one of two routes: a Full Plans application, where detailed drawings are checked and approved before work starts, or a Building Notice, where there are no plans and the work is inspected as it goes up.

Either can be handled by your local authority building control or by a registered building control approver (a private, government-registered inspector).

Full Plans application. You submit detailed drawings and specifications, building control checks them against the regulations, and you get approval before work begins. It gives you certainty up front and a documented approval, which lenders and buyers often want to see. It is the usual route for larger, structural or complex work.

Building Notice. You give notice that work is starting, without submitting full drawings, and building control inspects the work at key stages as it proceeds. It is quicker to start but carries more risk, because compliance is judged on site rather than agreed in advance. It suits smaller, straightforward projects.

Either way, building control inspects the work at set stages. When it is finished and compliant, you receive a completion certificate (or final certificate). Keep it, because you’ll need it when you sell or remortgage.

For help developing the building regulations and construction detailing package and managing approval, see our building regulations service and our guide to building regulations drawings.

Building regulations vs planning permission

Planning permission governs whether a development can go ahead and how it looks, is used and affects its surroundings. Building regulations govern the technical standards the build must meet so it is safe and sound. They are two separate approvals from two different bodies, and you often need both.

Getting planning permission does not mean you have satisfied the building regulations, and some work needs building regulations approval without needing planning permission at all. Most projects secure planning permission first, then move on to the building regulations detail. Our guides to planning applications and our planning service cover the planning stage.

What is changing in the building regulations in 2026

Building regulations are becoming more stringent in terms of energy efficiency and reduced carbon emissions. The Future Homes and Buildings Standards, introduced by the government through the Building Regulations etc. (Amendment) (England) Regulations 2026, will require new homes and buildings in England to be significantly lower-carbon from 24 March 2027, with a shift away from fossil-fuel heating and towards better fabric and low-carbon systems.

The same regulations update Approved Document L (energy) and Approved Document F (ventilation).

There are transitional arrangements. The new standards do not apply where a Building Notice, a Full Plans application or, with a private building control approver, an initial notice is given before 24 March 2027 and the work starts before 24 March 2028.

The Building Safety Act 2022, already in force, created the Building Safety Regulator and a stricter regime for higher-risk buildings. Designing to the coming standards now, rather than the outgoing ones, is the sensible approach. Our guide to sustainable and low-carbon design explains how.

Do you need an architect for building regulations?

An architect develops the building regulations and construction detailing package and sees the approval through. Building regulations drawings are detailed and technical, and getting them right reduces the risk of delay or abortive cost.

An architect brings the design and the technical detail together. Planning an extension or a new home? Our team can handle the building regulations detail for you, from the drawings to sign-off. See our building regulations and architectural design services, or arrange a consultation.

Arrange a consultation

Frequently asked questions

What are building regulations?

Building regulations are the minimum legal standards for the design and construction of buildings in England and Wales. They cover structure, fire safety, energy, ventilation, drainage, accessibility and more, set out in the Approved Documents. Most building work must meet them, and compliance is checked by building control. Wales has its own set of Approved Documents.

Do I need building regulations approval?

Most new building work, structural alterations and changes of use need building control approval. That includes extensions, garage conversions, removing load-bearing walls and many window, boiler and electrical works. A few minor works are exempt, such as some small porches and detached outbuildings, but exemptions have conditions. This is separate from planning permission, so you can need one without the other.

What is the difference between building regulations and planning permission?

Planning permission decides whether a development can go ahead and how it looks, is used and affects its surroundings. Building regulations set the technical standards the build must meet so it is safe and sound. They are separate approvals from different bodies. Planning permission does not cover the building regulations, and you often need both, usually planning first.

What is the difference between Full Plans and a Building Notice?

A Full Plans application has your detailed drawings checked and approved before work starts, giving certainty and a documented approval. A Building Notice has no plans submitted, and the work is inspected as it proceeds. Full Plans is usual for larger, structural or complex work, while a Building Notice suits smaller, straightforward jobs but carries more risk because compliance is judged on site.

What happens if you don’t get building regulations approval?

Building without approval is a breach of the regulations. The local authority can require you to open up, alter or remove the work, and can prosecute. You will also have no completion certificate, which causes problems when you sell or remortgage, as buyers and lenders ask to see one. Unauthorised work can sometimes be regularised after the fact, but that is slower and more expensive than undertaking this during the course of the construction works.

How long does building regulations approval take?

For a Full Plans application, the government sets a decision period of five weeks, or two months if you agree to an extension. A Building Notice lets work start sooner but shifts the checking on site as the build proceeds. Either way, inspections continue through the build to the completion certificate.

Share on your socials...

Facebook X LinkedIn

Let’s create something Amazing

We believe that architecture is not just about buildings, it’s about building relationships grounded in trust, transparency, and shared vision.

With over two decades of comprehensive experience in the architecture sector, our service offering is broad, meticulous, and finely tuned.

Let’s create something Amazing

Get started today...

It all starts here, tell us a bit about your project and one of our expert architects will get in touch to discuss your idea in more detail.